May 25, 2018

Weekend Subway Service Advisory

Service Changes are Part of Subway Action Plan,
Station Repairs and Other Ongoing Maintenance,

Repair and Upgrade Work for Improvements on the
1 2 3 4 5 a b c d e f j m n r lines

These weekend service changes are part of the MTA Subway Action Plan, the Enhanced Station Initiative in Queens and Manhattan and ongoing maintenance, repair and upgrade work throughout the MTA New York City Transit subway system.  These programs maintain and upgrade track, signal, station and other infrastructure in order to provide MTA customers with safe and reliable service.  More information on the 2015-2019 Capital Program is available here.

This weekend, work crews will be dispersed throughout the entire subway system to perform a variety of critical tasks in the areas of track replacement and maintenance, signal modernization, station enhancements, electrical upgrades and communication improvements.  All of this work is aligned with the MTA Subway Action Plan, a comprehensive plan to stabilize and modernize the subway system by attacking the key drivers of 79 percent of delay-causing major incidents and strategically targeting additional personnel and equipment to focus on critical parts of the system.   

For a simple, graphical guide that makes it easy to visualize how this weekend maintenance, upgrade and repair work will affect subway service – and what alternative travel options are recommended – consult The Weekender at web.mta.info/weekender.html. The Weekender is accessible through the MTA website by clicking the “Weekender” tab within the Service Status Menu, and is also available as a free app for iPhone and Android devices.

TripPlanner+ is an online tool that provides customized travel guidance based on available service and takes weekend service diversions into account.  In addition, customers can receive customized subway status emails or texts by signing up at www.MyMTAalerts.com.

1

From 4:45 a.m. to 8 p.m. Saturday, May 26, and Sunday, May 27, uptown 1 trains skip 103 St, 110 St, 116 St, and 125 St due to track maintenance.  Use a downtown 1 to complete your trip.  Transfer at 168 St or 96 St.      

2

From 11:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, 2 trains make all 5 line weekend stops between Eastchester-Dyre Av 5 and E 180 St.  Transfer between 2 and 5 trains at E 180 St. 

23

From 11:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, 23 service will be suspended in Brooklyn due to Fix&Fortify Sandy Recovery Work in the Clark St Tunnel.  This project is part of MTA’s ongoing efforts to fix assets damaged during Sandy, and include repairs and rehabilitation of tracks, signals, pump rooms, fire protection system, and power and communication cables.

  • 23 trains will not run in Brooklyn. 4 and 5 trains will run local in Brooklyn.  Service will not be available at the Clark St and Hoyt St stations.  As an alternative, use the nearby Borough Hall and Nevins St 45.   
  • 2 trains will run between South Ferry and the Bronx, making local stops between Chambers St and 34 St.
  • 3 trains will run between 14 St and Harlem-148 St. Transfer at Atlantic Av-Barclays Ctr or Times Sq nqr, or free out of system transfer between Bowling Green 45 and South Ferry 12.  
  • 4 service will extend to New Lots Av except from 4:30 a.m. Saturday, May 26 to 10 p.m. Monday, May 28, when the last stop for all Brooklyn-bound 4 trains will be Crown Hts-Utica Av. Free shuttle buses will make all station stops between Crown Hts-Utica Av and New Lots Av during this time.  Transfer between trains and shuttle buses at Crown Hts-Utica Av. 
  • 5 service will be extended to Flatbush Av-Brooklyn College to replace the 2.

25

From 5:45 a.m. to 7 p.m. Saturday, May 26 and Sunday, May 27, Manhattan-bound 25 trains will run express between E 180 St and 3 Av- 149 St due to track maintenance.  Use a Dyre Av-bound 2 or 241 St-bound 5 to complete your trip.  Transfer at 149 St-Grand Concourse or E 180 St.  

4

From 4:30 a.m. Saturday, May 26 to 10 p.m. Sunday, May 28, 4 service is suspended in both directions between Crown Hts-Utica Av and New Lots Av due to track replacement.  4 service operates between Woodlawn and Crown Hts-Utica Av.  Free shuttle buses will make all station stops between Crown Hts-Utica Av and New Lots Av during this time.  Transfer between trains and shuttle buses at Crown Hts-Utica Av. 

5

From 11:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, 5 trains make all weekend 2 stops between Wakefield-241 St 2 and E 180 St.  Transfer between 2 and 5 trains at E 180 St. 

a

From 9:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, downtown a trains run express from 125 St to 59 St-Columbus Circle due to station enhancements.  Use an uptown a local or c to complete your trip.  Transfer at 59 St-Columbus Circle or 125 St.  As a reminder, c service does not run overnight.       

a

From 9:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, a service is suspended in both directions between Inwood-207 St and 168 St due to track maintenance.  a trains will run between 168 St and Lefferts Blvd/Far Rockaway.  1 trains make nearby stops between 168 St and 207 St.  Free shuttle buses will operate along two routes: on Broadway, between 168 St and 207 St, and on Fort Washington Av, between 168 St and 190 St.  Transfer between trains and buses at 168 St. 

a

From 10 p.m. Friday, May 25, to 5 a.m. Monday, May 29, a trains stop at 155 St in both directions due to station rehabilitation work at 145 St and 168 St. 

ac

At all times until September 2018 ac trains skip 163 St-Amsterdam Av in both directions due to MTA’s Enhanced Station Initiative project.  When this project is completed, customers will benefit from critical structural and safety repairs and improvements to concrete and steel features such as columns, beams, platforms, walls and stairs. There will also be other improvements and upgrades such as improved waterproofing, a reconfigured mezzanine area including new glass barriers, new security cameras, LED lighting for increased light and energy efficiency, and enhanced signage for easier navigation including digital, real-time service change and train and bus arrival information.  For alternate service during this closure, use the nearby 168 St AC, 155 St ac, or 157 St 1 instead.  Use M3, M100 or M101 buses and transfer to the ac at 168 St or 155 St with MetroCard.  Need to transfer to another bus?  Ask the M3, M100 or M101 driver for a MetroCard Bus Transfer which is valid on your next local bus ride within two hours.  On your return trip, ask the station agent at 168 St or 155 St for a transfer to the bus.

b

Beginning 9 p.m. Friday, May 25, b service will end early due station enhancements at 72 St and 110 St.  Take the cd and/or q instead.  As a reminder, b service does not run on weekends.  

bc

At all times until September 2018, bc trains will skip Cathedral Parkway-110 St in both directions due to MTA’s Enhanced Station Initiative project.  When this project is completed, customers will benefit from critical structural and safety repairs and improvements to concrete and steel features such as columns, beams, platforms, walls and stairs. There will also be other improvements and upgrades such as improved waterproofing, a reconfigured mezzanine area including new glass barriers, new security cameras, LED lighting for increased light and energy efficiency, and enhanced signage for easier navigation including digital, real-time service change and train and bus arrival information.  For alternate service during this closure, walk to the nearby bc stations at 116 St and 103 St, along Fredrick Douglas Blvd/Central Park West.  Or take the 1 at 110 St, along Broadway.  Use the M10 bus along Fredrick Douglas Blvd and transfer to the bc (a overnight) at 116 St or 103 St with MetroCard.  If you need to transfer to another bus, ask the M10 bus operator for a MetroCard Bus Transfer, which can be used on your next local bus ride within two hours.  On your return trip, ask the station agent at 116 St or 103 St for a transfer to the bus.

bc

At all times until October 2018, bc trains will skip 72 St in both directions due to MTA’s Enhanced Station Initiative project.  When this project is completed, customers will benefit from critical structural and safety repairs and improvements to concrete and steel features such as columns, beams, platforms, walls and stairs. There will also be other improvements and upgrades such as improved waterproofing, a reconfigured mezzanine area including new glass barriers, new security cameras, LED lighting for increased light and energy efficiency, and enhanced signage for easier navigation including digital, real-time service change and train and bus arrival information.  For alternate service during this closure,  Use nearby bc stations at 81 St-Museum of Natural History and 59 St-Columbus Circle.  Or take the 123 at 72 St, along Broadway.  Use an M10 bus along Frederick Douglass Blvd and transfer to the bc (a overnight) at 81 St or 59 St with MetroCard.  If you need to transfer to another bus, ask the M10 bus operator for a MetroCard Bus Transfer which can be used on your next local bus ride within two hours.  On your return trip, ask the station agent at 81 St or 59 St for a transfer to the bus.

c

From 9:45 p.m. to 11:30 p.m. Friday, May 25, and from 6:30 a.m. to 11:30 p.m. Saturday, May 26 to Monday, May 28, c service is suspended in both directions between 145 St and 168 St due to track maintenance.  c trains will run between 145 St and Euclid Av.  a trains will stop at 155 St.  Transfer at 145 St.   

c

From 9:45 p.m. to 11:30 p.m. Friday, May 25, and from 6:30 a.m. to 11:30 p.m. Saturday, May 26 to Monday, May 28, downtown c trains run express from 145 St to 59 St-Columbus Circle due to station enhancements.  Use an uptown a local or c to complete your trip.  a trains stop at 135 St.  Transfer at 59 St-Columbus Circle, 125 St, or 145 St. 

d

From 9:30 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, a service is rerouted in both directions via the a express between 59 St-Columbus Circle and Jay St-MetroTech, and via the f between Jay St-MetroTech and Coney Island-Stillwell Av due to signal improvements.  Use ace stations on 8 Av or nqr stations on Broadway to complete your trip.  f trains will make all d line station stops between Atlantic Av-Barclays Ctr and Coney Island-Stillwell Av.  Free shuttle buses will operate between W 4 St-Wash Sq and Grand St.  Transfer at Times Sq-42 St/Port Authority acdefnqr, Jay St-MetroTech acdnr, or 4 Av-9 St dg

e

From 11:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, Manhattan-bound e trains skip Briarwood, and 75 Av due to track maintenance.  Use a Jamaica Center-bound e or Jamaica-bound fr to complete your trip.  Transfer at 71 Av, Union Tpke, or Jamaica Van Wyck e.  As a reminder, r service is extended to 179 St, days and evenings. 

er

From 11:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, Manhattan-bound er trains run express from 71 Av to Roosevelt Av due to track replacement.  Use a Jamaica Center-bound e local or Jamaica-bound r to complete your trip.  Transfer at Roosevelt Av or 71 Av to complete your trip.  As a reminder, r service is extended to 179 St, days and evenings. 

f

At all times until mid 2018, Manhattan-bound f trains skip Avenue U, Avenue P, Avenue N, Bay Pkwy and Avenue I due to station renewal work on the Culver Line When finished, more than 27,000 daily customers will benefit from repaired staircases, fare control areas, walls, floors, platform girders, new platform windscreens, rubbing boards, tactile warning strips, improved lighting and artwork. 

  • For service to these stations, take a Manhattan-bound f train to Kings Hwy or 18 Av and transfer to a Coney Island-Stillwell Av bound f.
  • For service from these stations, take a Coney Island-Stillwell Av bound f train to Kings Hwy or Avenue X and transfer to a Manhattan-bound f.

f

From 9:30 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, f service is rerouted in both directions via the Q express between Lexington Av/63 St and Atlantic Av-Barclays Ctr, and via the d between Atlantic Av-Barclays Ctr and Coney Island-Stillwell Av due to signal improvements.  Use ace stations on 8 Av or nqr stations on Broadway to complete your trip.  d trains will make all f line station stops between Jay St-MetroTech and Coney Island-Stillwell Av.  Transfer at Times Sq-42 St/Port Authority acdefnqr, Canal St fnqr, or Jay St-MetroTech acdnr.  Free shuttle buses will run along two routes: between W 4 St-Wash Sq and East Broadway, and between Jay St-MetroTech and York St.    

f

From 9:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, Coney Island-Stillwell Av bound f trains skip Union St, 4 Av-9St, Prospect Av, and 25 St d stations due to signal improvements.  f trains will make all d line station stops in Brooklyn.  Use a Manhattan-bound fn local or r to complete your trip.  Transfer at 36 St or Atlantic Av-Barclays Ctr. 

f

From 11:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, Manhattan-bound f trains skip Sutphin Blvd, Briarwood and 75 Av due to track replacement.  Use a Jamaica Center-bound e or Jamaica-bound fr to complete your trip.  Transfer at 71 Av, Union Tpke, or Parsons Blvd fr.  As a reminder, r service is extended to 179 St, days and evenings. 

j

At all times until Summer 2018, Jamaica Center Parsons/Archer-bound j trains skip 121 St due to station rehabilitation work.  For service to this station, take the j to Sutphin Blvd and transfer to a Broad St-bound j.  As a reminder, Broad St-bound j trains skip 121 St from 7:15 a.m. to 8:15 a.m. on weekdays; take the z instead.  For service from this station, take the j to 111 St and transfer to a Jamaica Center-bound j

m

Beginning 8:30 p.m. Friday, May 25, m service will end early between 71 Av and Delancey-Essex Sts due to signal maintenance. 

n

At all times until fall 2018, Coney Island-Stillwell Av bound n trains skip Fort Hamilton Pkwy, New Utrecht Av, 18 Av, 20 Av, Kings Hwy, Avenue U and 86 St due to station rehabilitation work at nine stations on the Sea Beach LineWhen finished, this will yield a better travel experience for our customers including the installation of elevators at 8 Av and New Utrecht Av stations, providing our mobility impaired customers with better accessibility, upgraded communication systems, installation of Help Point intercoms, new stairways and handrails, reconstructed platforms and overpasses, repairs to canopies and columns, and artwork.

  • For service to these stations, take the Coney Island-Stillwell Av bound n to Bay Pkwy or Coney Island-Stillwell Av and transfer to a Manhattan-bound n.
  • For service from these stations, take a Manhattan-bound n to Bay Pkwy or 8 Av and transfer to a Coney Island-Stillwell Av bound n.
  • For New Utrecht Av-62 St, take the d Transfer between n and d trains at 36 St or Coney Island-Stillwell Av.

n

At all times until the end of June 2018, n trains skip 30 Av and 36 Av in both directions due to MTA’s Enhanced Station Initiative project.  When this project is completed, customers will benefit from critical structural and safety repairs and improvements to concrete and steel features such as columns, beams, platforms, walls and stairs. There will also be other improvements and upgrades such as improved waterproofing, a reconfigured mezzanine area including new glass barriers, new security cameras, LED lighting for increased light and energy efficiency, and enhanced signage for easier navigation including digital, real-time service change and train and bus arrival informationThere will also be a new staircase for exiting from the 30 Av Astoria-bound platform to the street-level intersection of 30th Avenue and Newtown Avenue.  For alternate service during this closure, use the nearby open Astoria line stations for n service at Broadway, Astoria Blvd, and 39 Av, or go to the Steinway St or 36 St mr stations.  Or, use the following convenient bus route(s):

  • Q102 to open Astoria line stations, Queensboro Plaza n7 or Queens Plaza emr
  • Q18 to Northern Blvd mr.
  • Q66 to Steinway St mr, Northern Blvd mr, 21 St-Queensbridge f, Queensboro Plaza n7, and Queens Plaza emr.
  • Q69 and Q100 Ltd to 21 St-Queensbridge f, Queens Plaza emr, Queensboro Plaza n7.

n

From 9:30 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, n trains are rerouted via the r Line (Lower Manhattan) in both directions between Canal St and DeKalb Av due to signal improvements.  Trains will stop at City Hall, Cortlandt St, Rector St, Whitehall St, Court St and Jay St-MetroTech. 

n

From 3:45 a.m. Saturday, May 26 to 10 p.m. Monday, May 28, n trains are suspended in both directions between Ditmars Blvd and Queensboro Plaza due to track replacement.  n trains will run between Queensboro Plaza and Coney Island-Stillwell Av.  Free shuttle buses will make all station stops between Ditmars Blvd and Queensboro Plaza.  Transfer between trains and buses at Queensboro Plaza. 

nr

From 9:45 p.m. Friday, May 25, to 5 a.m. Tuesday, May 29, Coney Island-Stillwell Av bound n and Bay Ridge-bound r trains run express in Brooklyn from Atlantic Av-Barclays Ctr to 59 St due to signal improvements.  Use a Manhattan-bound f, n local or r to complete your trip.  Transfer at 59 St nr, 36 St fnr, or Atlantic Av-Barclays Ctr.  As a reminder, f trains make d line station stops in Brooklyn. 

r

From 5:30 a.m. to 12 midnight, Saturday, May 26, to Monday, May 28, r service will operate to/from the 179 St f station due to signal improvements.  Manhattan-bound r trains skip Sutphin Blvd, Briarwood and 75 Av f stations. 

###
MTA New York City Transit • MTA Long Island Rail Road • MTA Metro-North Railroad • MTA Bridges and Tunnels • MTA Construction & Development • MTA Bus Company • MTA Police Department

2 Broadway
New York, NY 10004
Media Contact: (212) 878-7440


This message was sent by the Metropolitan Transportation Authority (MTA) press release distribution system. If you would like to customize which agencies you receive communications from, stop receiving emails, or discontinue receiving emails from the MTA altogether, please manage your preferences or unsubscribe at this link: manage your preferences or unsubscribe.

Copyright © 2024 New York State. All rights reserved. | Our Privacy Policy